Project summary
The project brief was to open up the floor space for a large property located in Reigate.
The existing kitchen and lounge was poorly lit and did not compliment the size of the property.
Our remit was to change that and open the ground floor kitchen and lounge and flood the room with natural light.
Did we deliver? Seeing is believing, so watch and see.
About the property
The property is located in Reigate, just off the the M25. The unit was constructed of brick with cavity walls in places, and solid walls in some areas.
The property was not located in a conservation area. The works carried out did not require planning permission, but did require full building regulations approval.
The property consists of 4 beds, 3 baths, kitchen/dining, 2 lounges.
Their were no adverse planning restrictions affecting development to the property.
Scope of works
* full removal of 3 internal load bearing walls
* full removal of 1 external load bearing wall
* partial removal of 4 internal supporting walls
* installation of timber stud wall
* installation for floor screed
* installation of 2 bifold aluminium bifold doors
* installation of 1 new window
* reposition of 1 external window
* installation of 1st fix plumbing and waste supplies for kitchen services
* installation of 1st/2nd fix electric
* reposition of mains electrical supply head (100 Amp mains fused)
* Construction of a rear kitchen extension
————————————————————————————————————————————————————————————
More services can be found at
http://www.diligentdevelopments.co.uk/residential-services-london/
————————————————————————————————————————————————————————————
Click here to SUBSCRIBE to the official Diligent Developments YouTube channel: http://www.youtube.com/subscription_center?add_user=diligentdevelopmentsuk
————————————————————————————————————————————————————————————
Further videos of interest:
1 – How To Remove internal load bearing wall with picture frame steel beam installation
https://www.youtube.com/watch?v=dgzRgBYkD-0
2 – how to remove internal load bearing wall with steel beam RSJ installation | London
https://www.youtube.com/watch?v=wDJJ2fmndz8
3 – how to renovate bathroom and install a shower cubicle london
https://www.youtube.com/watch?v=WbyYMXWXiQc
4 – How to remove load bearing walls with RSJ steel beams, and bi fold doors installation
https://www.youtube.com/watch?v=obD3_RopErw
————————————————————————————————————————————————————————————
Check out Diligent Developments:
Facebook: https://www.facebook.com/diligentdevelopments
Twitter: https://twitter.com/diligentdevuk
Pinterest: http://www.pinterest.com/diligentdev
G+: https://plus.google.com/+DiligentdevelopmentsUk
Tumblr: http://diligentdev.tumblr.com/
web: http://www.diligentdevelopments.co.uk
You must be logged in to post a comment.
This site uses Akismet to reduce spam. Learn how your comment data is processed.
What’s the crack with the bricks ? Looks good going that speed anyway
PIR insulation directly on to the flat rood joists? Looks like somone forgot to order the ply
Stupid hulk keeps coming up
banging tune.
This is absolute rubbish!
Why we don't employ Brits look at them boys go no tea break and the speed of them my boys will work for less than your boys Fact nice job
You have made a architectural thermal bridge by connecting the inner-wall with the outside-wall, beginners mistake i guess.
How do you fix the top of the bi-folds when there is a rsj there. Glue?