Complete Kitchen Remodel V.5 – Framing
This is video number 5 of a complete – COMPLETE – kitchen remodel. This video series includes demo, floor joist repair/replacement, sub-floor install (this video), cement board under lament install, tile, electrical (this video), drywall, paint, cabinet install, new counter tops, and finally all finish carpentry = job done!
In this video we complete the framing of a knee wall and an overhead to from the opening over a (soon to be) peninsula counter top – All in prep for drywall install in video 6. So please subscribe so you don’t miss seeing this project come together!
Support Do & Brew on Patreon – www.patreon.com/DoAndBrew
Email us at www.DoAndBrew@gmail.com
(Visited 15,445 times, 1 visits today)
About The Author
You Might Be Interested In
Comment (0)
LEAVE YOUR COMMENT
You must be logged in to post a comment.

Tip lag bolts = old way. Same with deck screws. A better & stronger way is to use GRK screws. No pre-drilling needed. https://www.grkfasteners.com/
Good video. I really like the detail that you give.
hello, just wondering if that was a load bearing wall you did that joist repair over head framing and knee wall? thanks
are you guys using 2 1/2 or 3 inch decking screws?
After this 5th Video, I think I can sit and watch you build a whole house. You make it look so easy
I`ve enjoyed this series, very informative. subscribed!!